Shopy 101

Fotoğraflar

Artemis III Booster Stacking Coverage - LH Aft Assembly

Ücretsiz

KategoriFotoğraflar
BiçimJPG
DilEN

Açıklama

Boeing employees, from left to right, Adam Shaffer, Electrical Ground Systems equipment and technical lead engineer; Anna Fischer, Space Launch System electrical engineering intern; Ethan Minvielle, Space Launch System electrical engineering intern; and Joseph Colangelo, Space Launch System Test and evaluation engineering intern, pose for a photograph following left-hand aft assembly solid rocket booster segment for NASA’s Artemis III SLS (Space Launch System) was secured to the mobile launcher at the agency’s Vehicle Assembly Building at NASA Kennedy on Thursday, July 9, 2026. The twin boosters, manufactured by Northrop Grumman in Utah, will provide more than 75 percent of the SLS rocket’s — NASA KSC · 2026. ABD devlet eseri: kamu mali, ticari islerde de serbestce kullanilabilir.

Nasıl açılır?

Ürünü indirmek ya da uygulama içinde okumak için Shopy 101 uygulamasını kullan. Kitaplığına eklediğin her şey tüm cihazlarında aynı kalır.