Açıklama
An overhead view shows the fully stacked twin solid rocket boosters for NASA’s Space Launch System (SLS) rocket on top of the mobile launcher inside High Bay 3 of the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida on June 9, 2021. Teams with NASA’s Exploration Ground Systems and contractor Jacobs are making final preparations to integrate the boosters with the SLS core stage, which arrived at Kennedy in April 2020. Manufactured by Northrop Grumman in Utah, the twin boosters provide more than 75 percent of the total SLS thrust at launch. When integrated, the 212-foot, 188,000-pound core stage and twin boosters will provide more than 8.8 million pounds of thrus — NASA KSC · 2021. ABD devlet eseri: kamu mali, ticari islerde de serbestce kullanilabilir.
Nasıl açılır?
Ürünü indirmek ya da uygulama içinde okumak için Shopy 101 uygulamasını kullan. Kitaplığına eklediğin her şey tüm cihazlarında aynı kalır.