About
Inside NASA’s iconic Vehicle Assembly Building at Kennedy Space Center in Florida, teams from Exploration Ground Systems and contractor Jacobs mate the Orion Stage Adapter (OSA) to the Interim Cryogenic Propulsion Stage (ICPS) on top of the Space Launch System (SLS) on Oct. 9, 2021. The addition of the OSA marks the last piece of SLS rocket hardware to be added before crews soon add the Orion spacecraft and its launch abort system on top of the OSA. The ring-shaped OSA is filled with 10 shoebox-sized CubeSats that will deploy when the ICPS separates from Orion on its way to the Moon during Artemis I, which will be the first integrated flight test of the SLS and Orion spacecraft. In later mis — NASA KSC · 2021. ABD devlet eseri: kamu mali, ticari islerde de serbestce kullanilabilir.
Source and licence
This work is public domain or openly licensed. The licence terms are published by the source.
How do I open it?
Use the Shopy 101 app to download it or read it in place. Anything you add to your library stays the same on every device.